Impedance, differential time and tripping current test, earth resistance meter calibration

EPTIS ID: 882562
PT scheme / program name: Electrical calibration
PT item type: Electrical safety
Sample / item: multifunctional measuring instrument
Model / type: Metrel MI 3100 SE
Reference Laboratory: ISO IEC 17025 accreditated laboratory or NMI

Impedance measurement

1. Z LINE: line impedance phase-neutral / phase (METREL MI 3100 s)
2. Z LOOP: impedance of the fault loop phase / earth (METREL MI 3100 s)
3. Zs rcd: impedance of the fault loop with low test current (METREL MI 3100 s)

Measurement points:

 UUT setting Nominal measurement points
Z line (0.50, 1.80, 5.00, 50.0, 100.0, 180) Ω
Z loop (0.50, 1.80, 5.00, 50.0, 100.0, 180) Ω
Zs rcd (0.50, 1.80, 5.00) Ω

Reference Laboratory CMC:

Value CMC
0.50 Ω 8 mΩ
1.80 Ω 18 mΩ
5.00 Ω 30 mΩ
50.0 Ω 0.39 Ω
100.0 Ω 0.50 Ω
180 Ω 1.0 Ω

Differential tripping time (RCD t) and current (RCD I)

Measurement points:
Trip Out time (RCD t)

UUT setting Nominal measurement points
10 mA X1 – AC – 0°- general non delayed 300 ms
30 mA X1 – AC – 0°- general non delayed (150, 300) ms
300 mA X1 – AC – 0°- general non delayed (150, 300) ms
30 mA X1 – AC – 180°- general non delayed 300 ms
30 mA X1 – AC – 0°- Selective 390 ms
30 mA X2 – AC – 0°- general non delayed 150 ms
30 mA X5 – AC – 0°- general non delayed 40 ms
500 mA X5 – AC – 0°- general non delayed 20 ms

Trip Out current (RCD I)
Execution of the points in the table to 20 ms (Trip out time reference)

UUT setting Nominal measurement points
10 mA – AC – 0° – general non delayed 10 mA
30 mA – AC – 0° – general non delayed 30 mA
1000 mA – AC – 0° – general non delayed 1000 mA
30 mA – AC – 180° – general non delayed 30 mA

Reference Laboratory CMC:

Value CMC
RCD trip Time 0.020 % rdg + 0.25 ms
RCD trip Current 1.0 % rdg

Measurement of earth resistance value

Measurement points and Reference Laboratory CMC:

Value CMC
0.10 Ω 5.0 mΩ
1.0 Ω 10 mΩ
10 Ω 60 mΩ
100 Ω 0.50 Ω
900 Ω 5.0 Ω

Note: Indications regarding organizational methods, presentation and sending of results will be reported in the PT participation protocol

Scheduled start date for PT: every year in September